Thessaloniki METROThessaloniki, 2006-2016

Employer : ATTIKO METRO
Construction J/V : SALINI IMPREGILO-AEGEK S.A.
Cost Estimation : 2 billion €
Status of Project : Under Construction

Project Description :
• 13 Underground Stations (3 or 4 levels) and Depot
• Fully automatic driverless operation
• 9.6km underground line with two tracks
• Middle distance between Stations : 700m
• Two ventilation shafts for each station
• Length of platform : 60m
• Platform fully separated from track with PSD doors
• Depot with stabling, maintenance and repair workshop facilities
• Main Operational Control Center (OCC)

Services provided : Final Architectural Design and Detail Architectural Design for the Construction and Operation of the METRO LINE.